Tony

Administrators
  • Posts

    2,435
  • Joined

  • Last visited

  • Days Won

    158

Everything posted by Tony

  1. There will be emergency network maintenance on FCR01 which our Venus server is on. This window is on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  2. There will be emergency network maintenance on FCR01 which our Jedi server is on. This window is on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  3. There will be emergency network maintenance on FCR01 which our Yoda server is on. This window is on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  4. There will be emergency network maintenance on FCR01 which our Neptune server is on. This window is on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  5. There will be emergency network maintenance on FCR01 which our Jupiter server is on. This window is on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  6. There will be emergency network maintenance on FCR02 which our Marlin server is on. This window is on Monday November 30th starting at 1:00am CST and lasting until 2:00am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR02.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 01:00 End time (CST): 02:00 Services affected: Public Network Location: DAL01 Duration: 1 hour
  7. There will be emergency network maintenance on FCR02 which our Raptor server is on. This window is on Monday November 30th starting at 1:00am CST and lasting until 2:00am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR02.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 01:00 End time (CST): 02:00 Services affected: Public Network Location: DAL01 Duration: 1 hour
  8. There will be emergency network maintenance on FCR01 which our Mercury server is on. This window is on Monday November 30th starting at 12:30am CST and lasting until 1:30am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 00:30 End time (CST): 01:30 Services affected: Public Network Location: DAL01 Duration: 1 hour
  9. There will be emergency network maintenance on FCR01 which our Mars server is on. This window is on Monday November 30th starting at 12:30am CST and lasting until 1:30am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 00:30 End time (CST): 01:30 Services affected: Public Network Location: DAL01 Duration: 1 hour
  10. There will be emergency network maintenance on FCR01 which our Skyline server is on. This window is on Monday November 30th starting at 12:30am CST and lasting until 1:30am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 00:30 End time (CST): 01:30 Services affected: Public Network Location: DAL01 Duration: 1 hour
  11. There will be emergency network maintenance on FCR01 which our Saturn server is on. This window is on Monday November 30th starting at 12:30am CST and lasting until 1:30am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. Further information about this can be found at: Emergency Network Maintenance [11/30/2009] Emergency Data Center Maintenance - FCR01.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 00:30 End time (CST): 01:30 Services affected: Public Network Location: DAL01 Duration: 1 hour
  12. There will be emergency network maintenance on all our servers behind FCR01 on Monday November 30th starting at 12:30am PST and lasting until 1:30am PST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. This will affect the following servers: Titan Here is the information we received from our provider regarding this: Emergency Data Center Maintenance - FCR01.SEA01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (PST): 00:30 End time (PST): 01:30 Services affected: Public Network Location: SEA01 Duration: 1 hour
  13. There will be emergency network maintenance on all our servers behind FCR01 on Monday November 30th starting at 1:00am EST and lasting until 2:00am EST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. This will affect the following servers: Jupiter Neptune Venus Jedi Yoda NS1 Here is the information we received from our provider regarding this: Emergency Data Center Maintenance - FCR01.WDC01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (EST): 01:00 End time (EST): 02:00 Services affected: Public Network Location: WDC01 Duration: 1 hour
  14. There will be emergency network maintenance on all our servers behind FCR04 on Monday November 30th starting at 2:00am CST and lasting until 3:00am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. This will affect the following servers: Bosco Here is the information we received from our provider regarding this: Emergency Data Center Maintenance - FCR04.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 02:00 End time (CST): 03:00 Services affected: Public Network Location: DAL01 Duration: 1 hour
  15. There will be emergency network maintenance on all our servers behind FCR02 on Monday November 30th starting at 1:00am CST and lasting until 2:00am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. This will affect the following servers: Raptor Marlin NS2 Hawk Host Server Here is the information we received from our provider regarding this: Emergency Data Center Maintenance - FCR02.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 01:00 End time (CST): 02:00 Services affected: Public Network Location: DAL01 Duration: 1 hour
  16. There will be emergency network maintenance on all our servers behind FCR01 on Monday November 30th starting at 12:30am CST and lasting until 1:30am CST. Although the window is for 1 hour we estimate that there will only be a down time of 15-20 minutes. This maintenance is necessary to correct an issue that could cause network interruptions that would not be scheduled. This will affect the following servers: Pluto Skyline Saturn Mars Mercury Here is the information we received from our provider regarding this: Emergency Data Center Maintenance - FCR01.DAL01 [11/30/2009] Date: Monday, November 30, 2009 (11/30/2009) Start time (CST): 00:30 End time (CST): 01:30 Services affected: Public Network Location: DAL01 Duration: 1 hour
  17. Yeah at this time we do not support python frameworks. Sorry missed the topic.
  18. You can try the RvSitebuilder system it's located in your cPanel.
  19. I figured it was worth mentioning this on the forum I posted a few solid tips some people may not be aware of when using Zend Framework and wanting to do AJAX: http://blog.hawkhost.com/2009/11/21/ajax-zend-framework-tips/
  20. We will be migrating the accounts on the Neptune server starting on Friday November 27th and this will last until Tuesday December 1st. The reason for this upgrade is our continued commitment to having exceptional quality of service. The Neptune server is showing it's age in specification so we feel everyone would benefit from a much needed upgrade. For the migration process we will be moving accounts in sections based on IP address. We anticipate no more than 5 minutes of down time per account in order to make the switch. We migrate the account data then re-route the IP address to the new server. Thus there is no down time associated with the upgrade. The time frame given we estimate will not be nearly this long. In the past we have migrated to other hardware without any down time in less than three days. So our 4 days just gives us plenty of time to do it right and make sure there is no interruption in service. The specifications of the server will be similar to the new Jupiter machine being Dual Xeon 5520's with 12GB ram and four 300GB SAS drives in raid-10. Old Neptune: Xeon 5430 4GB RAM 4x250GB SATA II Raid-10 New Jupiter: Dual Xeon 5520 12GB RAM 4x300GB SAS Raid-10 You'll notice three times as much memory and SAS drives which are significantly faster than the SATA counterparts. It'll also have twice as many CPU's and will be using the newer 5520 CPU. If you have any concerns about this migration please do not hesitate to contact us. Start Date: 11/27/2009 End Date: 12/01/2009 Estimated Down Time: less than 5 minutes Duration: 4 days
  21. That is correct
  22. With the reseller to shared hosting account add-on domains you'd need to move everything into the shared account. As far as the bandwidth if you're not going over the allocations I doubt it be an issue as the web server has no issue serving static content even if it's 100's of GB's a month.
  23. No it's not possible to do that with just one IP address and cPanel has a limit of one IP per account as well so adding additional ones would not be an option.
  24. Maybe it's just a really well designed script? Ever think of that
  25. Tony

    Pluto issue?

    Well based on the system graphs I do not anticipate anymore problems for a long time unless something unexpected happens.